This job was posted more than 40 days ago and might be expired.
Rimkus logo

Consultant - Forensic Delay Analysis

Posted 3 months ago

RemoteUnited States80k - 110k USD

Join Rimkus and unlock your potential with endless opportunities for growth, learning, and making a difference!

Rimkus (www.rimkus.com) is a worldwide leader in Engineering and Technical Consulting. Rimkus experts specialize in building envelope, engineering, forensic consulting, dispute resolution, construction management services, and solutions built for the environment.

NOW IS THE TIME to join this growing and stable company! We offer our full-time employees a competitive salary, bonus opportunities and a full benefits package that includes medical, dental, vision, life, disability, employer-matching 401(k), and opportunities for advancement!

Requirements

Overview:

As a Consultant within the Delay and Damages group, you will focus on Forensic Delay Analysis and work Subcontractor Default, Surety, Professional Liability, Builders Risk, Delay-In-Startup, Forensic Delay Analysis, Loss of Productivity and other complex construction claims and disputes. Responsibilities will include performing various methods of Forensic Delay Analysis on construction projects and various cost and quantum related analysis on construction claims and disputes for insurance carriers, law firms, owners, developers, and contractors around the world.

The Salary Range for this position is $80,000 to $110,000 and is dependent on education, experience, location and certifications/licensure.

ESSENTIAL JOB FUNCTIONS:

  • Performing Forensic Delay Analysis on construction project schedules and producing written forensic reports detailing the findings.
  • Performing contract, change order, cost overruns, and quantum-related analysis on complex construction claims and disputes for insurance carriers, law firms, owners, developers, and contractors and producing written forensic reports detailing the findings.
  • Managing and supporting in the research and analysis of contemporaneous project documentation.
  • Managing multiple projects and coordinating with other support team members to produce client reports in a timely manner.

REQUIRED EXPERIENCE, EDUCATION and CERTIFICATIONS:

  • Bachelor’s degree in engineering, architecture, or construction management.
  • 5-7+ years of experience performing CPM scheduling and cost analysis work.
  • Knowledge of Architecture, Civil, Structural, MEP, Building Enclosure systems and designs for commercial, retail, and high-rise residential buildings.
  • Experience in the analysis of construction claim damages including delay damages.
  • Proficiency in P6® scheduling software, experience with MS Project® and Asta®.
  • Proficiency in 3rd party schedule analysis software.
  • Proficient in Microsoft Office products such as PowerBI, Excel, Word, and PowerPoint.
  • Working knowledge of AutoCAD, Revit, Outlook, Word, and BlueBeam.
  • Experience coordinating with disciplines internally as well as externally with consultants /architects.
  • Experience conducting and attending construction sites, as well as preparing site reports.

Preferred SKILLS and ABILITIES:

  • Testifying experience is a plus for any candidate. If not, we will train and prepare you for this.
  • Experience with estimating software.

PHYSICAL DEMANDS, OVERTIME, and TRAVEL: 

  • Physical Demands - Work will be performed both in an office setting and at outside locations (i.e., Client’s office, industrial, construction, and/or residential sites). Employee is frequently required to stand, sit, climb ladders, bend, balance, stoop, kneel, crouch, talk, hear, and drive a motor vehicle to job sites. Employee may occasionally lift and/or move up to 50 pounds of equipment. Employee must be attentive, focused, and alert when conducting site inspections, speaking, and interacting with clients, preparing drawings and written reports. Clear vision and depth perception are also necessary.
  • Overtime - This position is classified as salaried with an exempt FLSA status. Regular working hours are 8:00 a.m. to 5:00 p.m., Monday through Friday, with one hour for lunch. There will be periods where overtime will be required, which the employee will need to comply with to meet the demands of the position.
  • Travel Requirements - This position requires up to 25% travel.  Some out-of-area and overnight travel may be required.

At Rimkus, we value a diverse and inclusive workplace where all employees feel valued and respected. We are committed to creating a work environment that supports and celebrates the unique perspectives and experiences of all employees. If you share our commitment to diversity and inclusivity and are excited about joining a welcoming and supportive team, we encourage you to apply for our open positions.

Rimkus is an Equal Employment Opportunity (EEO) Employer and will make all employment-related decisions without regard to race, color, religion, sex, sexual orientation, gender identity, genetic information, national origin, disability, or protected veteran status. 

THIS JOB DESCRIPTION IS SUBJECT TO CHANGE AND DOES NOT CONSTITUTE A CONTRACT FOR EMPLOYMENT OR A GUARANTEE OF CONTINUED EMPLOYMENT.

Rimkus works with a limited number of approved recruiting partners. All agency submissions must be made through our designated submission process. Unsolicited resumes will not be recognized.

Benefits

  • Health Care Plan (Medical, Dental & Vision)
  • Retirement Plan (401k, IRA)
  • Life Insurance (Basic, Voluntary & AD&D)
  • Paid Time Off (Vacation, Sick & Public Holidays)
  • Family Leave (Maternity, Paternity)
  • Short Term & Long Term Disability
  • Training & Development
  • Work From Home
Job details
Workplace
Remote
Location
United States
Salary
80k - 110k USD
per year

Your success is our business. We deliver optimal outcomes while safeguarding the integrity of our clients and the privacy of their customers.

Employees
1237
Industry
Business Consulting and Services
Headquarters
Houston, Texas
Founded
1983
Company location
12140 Wickchester Lane, Suite 300, Houston, Texas 77079, US
Specialties
Forensic Engineering, Accident Reconstruction, Construction Accidents & Defects, Fire & Explosion Analysis, Toxicology, Consumer Product and Food Safety, Animation, Graphics, & Demonstrative Evidence, Environmental & Toxic Torts, Biomechanical Analysis, Human Factors, UAS Investigations, Energy/Oil & Gas, Catastrophe Services, Offshore and Inland Marine, Geotechnical Assessments, Electrical Engineering, Manufacturing and Machinery Sciences, Structural Engineering, Biomedical Consulting/Medical Device and Equipment Failures, Industrial Accidents, Property Loss Consulting, Mechanical Engineering

Key team members

Gavin Huntley-Fenner, PhD

Gavin Huntley-Fenner, PhD

Peter Costa

Peter Costa

Jason Taylor, CEC., GSC., RRO., ARCA and RCABC Acc.

Jason Taylor, CEC., GSC., RRO., ARCA and RCABC Acc.

Koji Hirota

Koji Hirota

Apply smarter with Jobr

Jobr aggregates jobs directly from company career portals — no middlemen. Our team applies on your behalf with AI-tailored resumes, reviewed by a human before submission.

Direct from company career pages
AI-personalised cover letters
Human review before every submit
Application tracking & follow-ups